Public Meetings

Public Notices

Public Rules Website → 
Rules Hearing before South Dakota Transportation Commission on Thursday, Aug. 24, 2023 
Boards and Commissions Portal → 



Public Comments are taken for a period of approximately two weeks after a public meeting. If you would like to provide the SDDOT comments on a particular project, click on the link to review the public meeting information and email the contact person listed at the bottom of the page with any comments. If you don't see the project you are looking for, check the Special Studies page at the link below.

VISIT THE SPECIAL STUDIES PAGE FOR MORE PROJECT/CORRIDOR STUDY INFORMATION


Public Meetings - online, past, & current

Aberdeen Region

April 11, 2024 - Variable Speed Limits - Interstate 29 in Brookings County and Moody County

Meeting Details:

Date:
Thursday, April 11, 2024

Time: 5:30 p.m. to 7 p.m. Central Time
A short presentation will be given around 5:45 p.m.

Place: 
Brookings City and County Gov. Center 
Community Room 300
520 3rd Street
Brookings, SD 57006


Project Location
: Interstate 29 in Brookings County and Moody County

Improvement Type: Variable Speed Limit Corridor

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 

Notice
Flyer
Location Map
Presentation
Recorded Presentation
Handout
Displays

For more information or comments please contact Josh Larson (McLaury Engineering), who can be reached by email at jlarson@mclauryengineering.com or by phone at 605-271-8998.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Feb. 13, 2024 U.S. Highway12 Over Moccasin Creek

Meeting Details:

Date: Tuesday, Feb. 13, 2024
Time: 5:30 p.m. to 6:30 p.m. Central Time
Place: Best Western Ramkota Hotel 1400 8th Ave. NW. Aberdeen, SD 57401

Project Location
: U.S. Highway 12 Over Moccasin Creek

Improvement Type: Structure Replacement, Approach Grading, Curb & Gutter, and Sidewalk

Project: NH-B 0012(283)291, Brown County, PCN 04XD

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 

Notice
Flyer
Location Map
Presentation
Handout
Display 1 - Project Limits
Display 2 - Detour Map

For more information or comments please contact the SDDOT project manager Cary Cleland, who can be reached by email at Cary.Cleland@state.sd.us or by phone at 605-910-7012.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Nov. 13, 2023 - I-29 Exit 133 (US14 Bypass/18th Street) Interchange Modification Study
I-29 Exit 133 (US14 Bypass/18th Street) Interchange Modification Study

Monday, Nov. 13, 2023
5:30-7 p.m. Central Time

Brookings City and County Gov. Center
Council Chambers, Room 310
520 3rd St. Brookings, SD 57006

View the study website
June 29, 2023 - S.D. Highway 15 from Clear Lake to U.S. Highway 212

Location: S.D. Highway 15 from Clear Lake to U.S. Highway 212

Improvement Type: Grading, Structures (RCBC’s) & Interim Surfacing

Project: PH-P 0015(85)141  PCN 05F5

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 

Notice
Press Release 
Public Meeting Location Map
Flyer
Display 1 - S.D. Highway 15 South
Display 2 - S.D. Highway 15 North
Public Meeting Handout
Public Meeting Presentation 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
June 14, 2023 - S.D. Highway 47, S.D. Highway 249 & S.D. Highway 34 at Fort Thompson

Projects:
P-CR 0047(114)89, P-CR 0249(03)73 & P 0034(204)269, Buffalo County, PCN 060D, 060E & 074T

Location:
S.D. Highway 47 & S.D. Highway 249 in Fort Thompson and S.D. Highway 34 1 mile East of S.D. Highway 47

Improvement Type:
Urban Grading, Curb & Gutter, Asphalt Surfacing, Lighting, Shared Use Path, Bridge Replacement, Intersection Improvements, Pipe Work & Spot Grading

 Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Second Public Meeting Information – June 14 – June 28, 2023


First Public Meeting Information –
Aug. 17 - Sept. 9, 2020


205
Mark Malone
Road Design Engineering Supervisor
605-773-5409

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March, 30, 2023 - I-29 Exit 133 (US14 Bypass / 18th Street) Interchange Modification Study

The meeting has been rescheduled for Thursday, March, 30, 2023 at the same location and time.

The SDDOT has postponed the public meeting open house previously scheduled from 5:30 p.m. to 7 p.m. on Wednesday, Feb. 15, 2023, in the council chambers of the Brookings City-County Government Center, located at 520 3rd St. in Brookings. 


SDDOT I-29 Exit 133 Interchange Modification Study

The South Dakota Department of Transportation (SDDOT), in collaboration with the City of Brookings and the Federal Highway Administration (FHWA), will hold a public meeting open house from 5:30 p.m. to 7 p.m. on March 30, 2023, in the council chambers of the Brookings City-County Government Center, located at 520 3rd St. in Brookings. The public meeting is being held to inform area residents of the beginning of the Interstate 29/Exit 133 Interchange Modification Study.

The corridors being studied include:

  • I-29 from Exit 132 (U.S. Highway 14 / 6th Street) to one-half mile north of exit 133
  • U.S. Highway 14 Bypass / 18th Street from east of Jackrabbit Avenue to U.S. Highway 14 / 6th Street

The public meeting open house will be informal allowing for one-on-one discussion with the study team. A prerecorded presentation will play on a continuous loop for the duration of the open house. The purpose of the public meeting is to introduce preliminary interchange and crossroad concepts to the public and gather input on those concepts. Area residents, business owners, and daily commuters are encouraged to attend the public meeting and participate in the study. The opportunity to present written comments will be provided. Written comments on the public meeting will be accepted until Thursday, April 13, 2023. 

For those who cannot attend the open house or desire additional information on the overall study, the prerecorded presentation and open house displays will also be available at the study website www.i29exit133.com starting the day of the public meeting. The meeting presentation will be streamed through a link on the study website. The website also allows for online comments to be submitted. The study team would appreciate hearing from area commuters, concerned citizens, and adjacent landowners and business owners throughout the study period. 

Notice is further given to individuals with disabilities that this open house is being held in a physically accessible place. Any individuals with disabilities who will require a reasonable accommodation in order to participate in the open house should submit a request to the department’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunication Relay Services for the Deaf). Please request the accommodations no later than two business days prior to the meeting in order to ensure accommodations are available.

For more information, contact Steve Gramm, Planning Squad Leader, at 605-773-3281 or by email at steve.gramm@state.sd.us.

October 4, 2022 - S.D. Highway 37 from S.D. Highway 28 South 12 miles - Bead06VV
On Tuesday, October 4, 2022, the SDDOT will hold a Public Meeting from 5:30pm-6:30pm at the Crossroads Hotel in Huron.

Project:

Project Number: P-PH 0037(161)133

PCN: 06VV

S.D. Highway 37 from S.D. Highway 28 South 12 miles

Improvement Type:

Grading, Interim Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display

For further information regarding this project, contact Waylon Blasius Design Engineer Banner Associates, Inc.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
April 25, 2022 - SD28 Reconstruction in Toronto

Project:

Project Number P0028(47)367 PCN 06R7

S.D. Highway 28 in Toronto, SD Deuel County

Improvement Type:

Urban Grading

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer

Location Map
Presentation
Handout
Display

For further information regarding this project, contact Cary Cleland, Road Design Engineering Supervisor at (605) 367-5680 ex. 1802119.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 10, 2022 - SD 37 from 21st Street South to 9th Street South in Huron

Project:

NH 0037(156)125, Beadle County, PCN 06JA

Location: The project is on SD 37 from 21st Street South to 9th Street South in Huron

Improvement Type:

Urban Grading, PCC Surfacing, Storm Sewer, Curb & Gutter, Sidewalk, Lighting, Signals

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display South
Display North

For further information regarding this project, contact Cary Cleland, Road Design Engineering Supervisor at (605) 367-4970 Ext 1802119.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
February 14, 2022 Spink 076X - Public Meeting

Project:
P 0028(51)269, Spink County, PCN 076X

Location:
SD 28 - From US281 to 3 Miles East of Hitchcock

Improvement Type:
Grading, Interim Surfacing

Public Meeting Information: 
Notice
Flyer
Location Map
PowerPoint
Video Presentation
Handout
Display West 
Display Hitchcock
Display East


For more information or comments please contact the SDDOT project manager Mark Malone, by filling out the comment form below or by phone at (605) 773-5409.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
December 7, 2021 - Proposed Project to Reconstruct SD Hwy 21 (From Junction with SD28 N to Hayti)

December 7, 2021 - Proposed Project to Reconstruct SD Hwy 21 

Location:
SD Highway 21 (From Junction with SD28 N to Hayti)

Improvement Type:
Reconstruction

Public Meeting Information:

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
October 5, 2021 Proposed Project to Reconstruct US212 (From 5 miles East of Redfield to East of Frankfort)
Proposed Project:
Reconstruct US212 


Location
:
(From 5 miles East of Redfield to East of Frankfort)

Public Meeting Information:
October 5, 2021 5:30 PM - 7:00 PM
Frankfort Community Center

Public Meeting Notice
Meeting Flyer
Video Presentation
Handout
Location Map
Display East 
Display West

 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
May 5 - May 26, 2021 - SD Highway 25 From US 212 to the Clark/Day County Line

Project:
P 0025(81)158  PCN 04EW
P 0025(89)149  PCN 069D

Location:
SD Highway 25 From US 212 to the Clark/Day County Line 

Improvement Type:
Grading & Interim Surfacing

Presentation and Documentation:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
April 21 to May 19, 2021 – SD 28 from 192nd St east of Lake Poinsett to 1.2 mi west of Estelline

Project:
P 0028(48)346, Hamlin County, PCN 06NG

Location:
SD 28 from 192nd St east of Lake Poinsett to 1.2 mi west of Estelline 

Improvement Type:
Grading, Interim Surfacing, Replace Structures, Approach Grading

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Contact


205
Mark Malone
Road Design Engineering Supervisor
605-773-5409

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Feb. 10 - March 5, 2021 - SD 28 from Estelline to SD 15 Online Public Meeting

Project:
P-PH 0028(36)355, Deuel County, PCN 04HM 

Location:
SD28 – From Estelline to SD15 

Improvement Type:
Grading, Interim Surfacing, Replace Str RCBC, Approach Slab

Virtual Public Meeting Information - Feb. 10 thru March 5, 2021

Contact


209
Paul Nikolas
Road Design Engineer
605-367-5680



Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Jan 12 - Feb 5, 2021 - Highway 37 in Huron
Project:
NH 0037(158)126, Beadle County, PCN 06A2

Location:
SD37 - From 9th St. South to 3rd St. North in Huron 

Improvement Type: 
Urban Grading, PCC Surfacing, Storm Sewer, Curb & Gutter, Sidewalk, Lighting, Traffic Signals

Virtual Public Meeting Information – Jan. 12 - Feb. 5, 2021

CONTACT


208
Darin Johnson
Road Design Engineer
605-367-5680 Option 6
Dec. 9-28, 2020 SD 13 Public Information on Upcoming Construction
Project:
P-PH 0013(49)121, Brookings County, PCN 05EX

Location:
SD13 - Fm SD324 to US14; Str 0.8 S of US14 Over Medary Creek

 

Improvement Type: 
Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework


Virtual Public Meeting Information – December 9 – December 28, 2020

April 2020 (online info): Highway 15 from SD 28 N to Clear Lake
Project:
P-PH 0015(76)128, Deuel County, PCN 04HL

Location:
SD15 - Fm SD28 N to Clear Lake

Improvement Type:
Grading, Interim Surfacing

Construction Year:
2024

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – In-person meeting will not be held 

For more information contact: 


189
Cary Cleland
SF Road Design Project Manager
605-910-7012
March 23, 2020 – SD 10 from ½ mi west of Houghton to Britton
Project:
P-PH 0010(124)296, Brown & Marshall County, PCN 05F4

Location:
SD 10 from ½ mi west of Houghton to Britton

Improvement Type:
Shoulder Widening, Replace Structure (RCBC), Approach Grading, Intersection Improvements, Pipe Work

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – In-person meeting has been cancelled

CONTACT


205
Mark Malone
Road Design Engineering Supervisor
605-773-5409

May 25, 2017 - S.D. 25 Shoulder Widening Project
Project:
PH 0025(76)131, PCN 04KU, Clark County

Location:
SD 25, fm North Junction of SD 28 to 6.5 mi north

Improvement Type:
Shoulder Widening, Spot Grading, Pipe Work

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - May 25, 2017
For more information or comments please contact the SDDOT project manager Cary Cleland, who can be reached at 605.367.5680.

open all


Mitchell Region

March 13, 2024 - Minnehaha County Corridor Study for SD 38 from Humboldt to Sioux Falls
The South Dakota Department of Transportation (SDDOT), in collaboration with the City of Hartford, City of Humboldt, City of Sioux Falls, Minnehaha County, Sioux Falls MPO, and the Federal Highway Administration, will hold a public meeting open house from 5:30 p.m. to 7:30 p.m. on Wednesday, March 13, 2024, at West Central High School located at 705 E. 2nd St. in Hartford. The public meeting is designed to inform area residents of the improvement concepts developed for the S.D. Highway 38 Corridor Study.

HTTPS://WWW.SD38CORRIDORSTUDY.COM
March 12, 2024 - Interstate 229 Exit 6 (10th Street) Interchange Study

The South Dakota Department of Transportation (SDDOT), in collaboration with the City of Sioux Falls, the Sioux Falls MPO, and the Federal Highway Administration, will hold a public meeting open house from 5:30 p.m. to 7:30 p.m. on Tuesday, March 12, 2024 at Lincoln High School (2900 S. Cliff Ave.) to inform area residents of the recommendations from the Interstate 229, exit 6, Interchange Modification Study.

HTTPS://WWW.I229EXIT6.COM

Feb. 20 and 21, 2024 - for S.D. Highway 37 Corridor Study between Mitchell and Parkston
Dec. 5, 2023 - S.D. Highway 34 from Colman to Interstate 29

Date:   
Tuesday, Dec. 5, 2023, at 5:30 p.m. Central Time

Place:  
Colman Community Center 
120 N Main Ave
Colman, SD 57017

Location: S.D. Highway 34 from Colman to Interstate 29

Improvement Type: Grading, PCC Surfacing, LSDC Overlay, Curb & Gutter, Lighting

Project: NH 0034(211)404, Moody County, PCN 080K

Structure Number: 51-065-150

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 
Public Meeting Flyer
Public Meeting Handout
Public Meeting Notice
Public Meeting Location Map
Public Meeting Display
Public Meeting Presentation

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Oct. 30, 2023 - Northshore Drive Realignment – North Sioux City, SD
Date: October 30, 2023
Time: 5:00 p.m. – 7:00 p.m.
Place: North Sioux City Community Center
205 Sodrac Drive
North Sioux City, SD 57049

The South Dakota Department of Transportation (SDDOT) will hold a public meeting open house on Monday, Oct. 30, 2023, from 5 – 7 p.m. CT to inform area residents of the proposed realignment project on Northshore Drive, in North Sioux City.

The public meeting open house will be held at the North Sioux City Community Center, located at 205 Sodrac Dr. in North Sioux City. The open house will be informal allowing for one-on-one discussion with design staff and the consultant. Representatives from SDDOT will be available to answer questions, discuss the project, and receive community input.

The purpose of the meeting is to provide information and gather public input. Area residents, business owners, and daily commuters are encouraged to attend and participate in the public meeting open house. This project is being developed in compliance with state and federal environmental regulations.

Written comments on the public meeting will be accepted until Monday, Nov. 13, 2023.

Notice is further given to individuals with disabilities that this open house is being held in a physically accessible place. Any individuals with disabilities who will require a reasonable accommodation to participate in the open house should submit a request to the department’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunication Relay Services for the Deaf). Please request the accommodations no later than two business days prior to the meeting to ensure accommodations are available.

For more information, contact Paula Huizenga, Grants Program Engineer, at 605-773-6253 or paula.huizenga@state.sd.us.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Sept. 28, 2023 - Resurfacing and Intersection Modification Near Madison

The South Dakota Department of Transportation (SDDOT) will hold a public meeting open house on Thursday, Sept. 28, 2023, to discuss and receive public input on a resurfacing and intersection modification project at the intersection of S.D. Highway 34 and 457th Avenue near Madison. This public meeting open house will be held in the Depot Room at the Madison Chamber of Commerce, located at 315 S. Egan Ave. The public meeting open house will be held from 5:30 to 7:30 p.m.

The public meeting will be informal with the opportunity for one-on-one discussions. SDDOT and consultant design staff will be available with displays to discuss the proposed intersection improvements and answer questions. During this public meeting, participants will also have the opportunity to present written comments.

Written comments will be accepted until Thursday, Oct. 19, 2023, and may be submitted at the open house or directly to one of the project contacts.

Notice is further given to individuals with disabilities that this open house is being held in a physically accessible place. Any individuals with disabilities who will require a reasonable accommodation in order to participate in the open house should submit a request to the department’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunication Relay Services for the Deaf).  Please request the accommodations no later than 2 business days prior to the meeting in order to ensure accommodations are available.

For more information, contact Travis Dressen, SDDOT Mitchell Region Engineer, at 605-995-3300 or by email at Travis.Dressen@state.sd.us, or Matthew Brua, HR Green, at 605-221-2655 or by email at mbrua@hrgreen.com.

Sept. 6, 2023 - West Yankton County Transportation Study

Date:
Sept. 6, 2023

Time:
5:30 p.m. - 7:00 p.m.

Location:
NFAA Easton Yankton Archery Center
800 Archery Lane 
Yankton, SD 57078

The presentation will be broadcast live and a link to the broadcast will be on the Yankton County website: www.co.yankton.sd.us

July 20, 2023 - I-29 Corridor Study
View the I-29 Corridor Study Website: 
I-29 CORRIDOR STUDY WEBSITE
July 18, 2023 - S.D. Highway 37 Through Parkston

Location: S.D. Highway 37 Through Parkston 

Improvement Type: Urban Grading, PCC Surfacing, Curb & Gutter, Lighting, ADA, Storm Sewer

Project: NH 0037(169)51, Hutchinson County, PCN 077F

Structure Number: 34-060-079

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: The public meeting will be held on July 18, 2023, at Parkston Emergency Services, located at 309 East Main St. in Parkston. 

Public Meeting Flyer
Public Meeting Handout
Public Meeting Notice
Public Meeting Location Map

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
June 20, 2023 & June 21, 2023 - S.D. Highway 44 Platte-Winner Bridge Environmental Assessment (EA) and Section 4(f) Evaluation

View the S.D. Highway 44 Platte-Winner Bridge Corridor Study and Environmental Assessment (EA) Website:
S.D. HIGHWAY 44 PLATTE-WINNER BRIDGE Corridor Study and Environmental Assessment (EA) Website


PUBLIC MEETING HANDOUT – 06/20/2023 & 06/21/2023

The South Dakota Department of Transportation (SDDOT) and Federal Highway Administration (FHWA) will hold public meeting open houses on Tuesday, June 20, 2023, in Winner and Wednesday, June 21, 2023, in Platte to inform the public and gather public input on the S.D. Highway 44 Platte-Winner Bridge Environmental Assessment (EA) and Section 4(f) Evaluation.

The Tuesday public meeting open house will be held at the Holiday Inn Express located at 1360 E. Highway 44 in Winner. The Wednesday public meeting open house will be held at the Platte Community Center located at 310 Main St. in Platte. Both meetings will be held from 5:30 p.m. to 7 p.m.

Replacement of the Platte-Winner Bridge requires realignment of portions of the Highway 44 corridor immediately adjacent to the Missouri River. The total realignment represents approximately one mile of new bridge plus an additional .5 miles of new roadway on either side of the river, totaling two miles of realignment. The Snake Creek Recreation Area is located on the east side of the bridge. Due to the realignment, SDDOT has worked cooperatively with South Dakota Game, Fish, and Parks (SDGFP) to mitigate the potential impacts caused by the bridge project to the park.

This EA completes a comprehensive evaluation of impacts in categories including land use, archeological and historic resources, noise, wetlands/streams, floodplains, threatened and endangered species, recreational resources, and regulated materials along the route. Due to the presence of recreational and historic resources, this environmental evaluation includes a Section 4(f) analysis which has resulted in a proposed 4(f) de minimis findings.

Throughout each open house event, project staff will be available with displays to discuss the project and answer questions. Information will be available on the EA and Section 4(f) process and findings. Additional information will be available about the proposed construction timeline. SDDOT has committed to keeping the existing bridge open to traffic during construction of the proposed bridge.

Notice is further given to individuals with disabilities that this public open house will be held in a physically accessible place. Any individuals requiring a reasonable accommodation should submit a request to the SDDOT’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunications Relay Services for the Deaf) at least two business days prior to the public open house.

All interested persons are invited to view the EA, Section 4(f) documents, and a presentation on the project website,https://sd44bridge.com in advance of the public meeting open houses. Printed copies for onsite viewing of the EA will be available at the public meeting open houses, the Platte City Hall located at 310 S. Main St., the SDDOT Winner Area Office located at 1200 S.D. Highway 44 E. in Winner, the SDDOT Mitchell Region Office located at 1300 Ohlman St. in Mitchell, and the SDDOT Central Office located at 700 E. Broadway Ave. in Pierre. 

Comments on the EA will be accepted starting June 1, 2023, through Friday, July 7, 2023. Written comments can be submitted at the public open houses, online at https://sd44bridge.com or by email to steve.gramm@state.sd.us.  Verbal comments can also be submitted at the open house or by phone to Steve Gramm (SDDOT) at 605-773-3281, or Tim Thoreen (HR Green) at 651-659-7777.

In developing this project, SDDOT published the S.D. Highway 44 Platte-Winner Bridge Corridor Study in November 2019. That study established a recommended alignment for the new bridge and facilitated further coordination with agency partners including the U.S. Army Corps of Engineers (USACE), U.S. Coast Guard, and SDGFP to obtain project approvals on issue areas including recreational resources and cultural/historic resources. Design and permitting are underway and construction will occur in phases starting in 2024. The new Highway 44 Bridge over the Missouri River is anticipated to be open to the public in 2027.

For more information, visit https://sd44bridge.com.

June 8, 2023 - S.D. Highway 38 Corridor Study
View the S.D. Highway 38 Corridor Study Website:
S.D. HIGHWAY 38 CORRIDOR STUDY WEBSITE
May 18, 2023 - Lincoln County Highway 106 Corridor Study
March 30, 2023 - U.S. Highway 18 from 1 mile East of S.D. Highway 37 to S.D. Highway 25

Date: Thursday, March 30, 2023

Time:
5:30 p.m. CDT

Place:
Tripp-Delmont School
105 S. Sloan St.
Tripp, SD 57376

Project
:
PCN: 077G

Location:
U.S. Highway 18 from 1 mile East of S.D. Highway 37 to S.D. Highway 25

Improvement Type:

Grading, Shoulder Widening, Replace Structures, and Interim Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display-West
Display-East

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 27, 2023 - U.S. Highway 18 - Davis, S.D.

Monday, March 27, 2023
5:30 pm to 6:30 pm CT
American Legion Outpost #176
110 E. U.S. Highway 18, Davis, SD 57021

Location:
U.S. Highway 18 from Railroad Avenue to Montana Avenue Davis, S.D.
Urban Grading, Curb & Gutter, Lighting, ADA Upgrades, Storm Sewer, AC Surfacing

Improvement Type:
Reconstruct U.S. Highway 18

 Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions


Public Meeting Information 


PCN 06G3

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 6, 2023 - S.D. Highway 19 Urban Reconstruction through Viborg

Monday, March 6, 2023, 5:30 pm to 6:30 pm
Viborg Community Center 101 East Sorenson Street, Viborg, SD


Project
:
PCN: 077L

Location:
S.D. Highway 19 Urban Reconstruction through Viborg

Improvement Type:

Urban Reconstruction

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display

As of April 14, 2023: 
Revised Typical Sections
Public Meeting Follow-Up Information

Dec. 13, 2022 - S.D. Highway 34 from 13 miles east of Fort Thompson to S.D. Highway 45

THE IN PERSON PUBLIC MEETING HAS BEEN CANCELED - CHANGED TO VIRTUAL - PLEASE VIEW PRESENTATION VIDEO BELOW 

Project:
S.D. Highway 34 from 13 miles east of Fort Thompson to S.D. Highway 45
(Buffalo County 13mi E of Fort Thompson)

PCN:
077E

Location:
S.D. Highway 34 from 13 miles east of Fort Thompson to S.D. Highway 45

Improvement Type:
Shoulder Widening

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Handout
Presentation
Location Map
Display





Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Dec. 1, 2022 - West Yankton County Master Transportation Plan Study

The West Yankton County Master Transportation Plan study will address a full range of transportation options and issues, including pedestrian, bicycle, transit, freight, and automobile, within the area of Yankton County west of the City of Yankton and south of S.D. Highway 50. The purpose for the open house public meeting is to inform the public of the study’s intent, to record any concerns the public may have on transportation within the study area, and to gather ideas to help determine the future look of roadway, bus/transit, bicycle, and pedestrian systems within the study area.

For those who cannot attend the meeting, or desire additional information on the study, information will be made available online after the meeting on the Yankton County website at www.co.yankton.sd.us. The presentation will begin shortly after 5:30 and will be broadcast live on the Yankton County website.

The opportunity to present written comments will be provided. Written comments will be accepted until Friday, Dec. 16, 2022.

Dec. 1, 2022 - South Veterans Parkway
Nov. 9, 2022 - S.D. Highway 11 and S.D. Highway 115 - Northern Lincoln County Corridor Study
Oct. 13, 2022 – S.D. Highway 50 - Yankton

Project:

NH 0050(133)381, Yankton County, PCN 077J
PCN: 06VV

Location:

SD50 – in Yankton

Improvement Type:

Construct Additional Lane

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display

For more information or comments please contact the SDDOT Road Design Engineer Brandon Riss, who can be reached below or by phone at (605) 367-5680 Option 6.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
April 11, 2022 Clay County Master Transportation Plan Study

View the Clay County Master Transportation Plan Study Website:

 

https://ulteig.com/claycountymtp/

March 24, 2022 Shoulder Widening Project on U.S. Highway 18

Project Info: PCN 04KT, PH 0018(192)390

The South Dakota Department of Transportation (SDDOT) advises construction on U.S. Highway 18 from the James River to U.S. Highway 81 intersection will begin early April, 2022. The purpose of this project is to widen the shoulders of US18 from Olivet east to US81 with an exception through Menno, as well as replace multiple drainage structures. The existing roadway is 26 feet wide consisting of 12-foot driving lanes and 1-foot shoulders. The goal of this project to is to widen the roadway to 36’ by maintaining 12-foot lanes and extending the shoulders to 6-foot. Mainline surfacing will not be done with this project but is scheduled to begin in 2023 under a different contract. This project will be completed in three sections…

Section 1 - Just east of 437th Avenue to Highway 81: This section will be completed first and is 1.2 miles in length. Work includes full roadway grading, culvert replacements, and removal and reconstruction of a Cast-in-Place Box Culvert. A detour will be used during completion of this section for a maximum of 40 days.

Section 2 - Just east of the James River to Just east of 428th Avenue: This section will be completed last and is 1.3 miles in length. Work includes full roadway grading and culvert replacements. A detour will be used during completion of this section for a maximum of 20 days.

Section 3 - Just east of 428th Avenue to just east of 437th Avenue: This section will be completed throughout much of the summer and is 9.8 miles in length. Work includes shoulder widening and culvert replacements. Flaggers and Pilot Car will be used to maintain traffic during its construction.

Foothills Contracting, Inc. of Webster, SD is the prime contractor of the $9.882 million project. Work will be performed thru November 2022 with Field Work Completion date of November 18, 2022.


Public Meeting Documents: 
-Public Meeting Flyer
-Layout Map
-Detour Map

Contractors Contact:
Foothills Contracting, Inc.
PO Box 558
Webster, SD 57274
605-345-3795

DOT Contact:
Greg Rothschadl, Kevin Heiman, or Nathan Schulte
SDDOT – Yankton Area Office
1306 West 31st Street
Yankton, SD 57078
605-668-2929

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Jan. 25, 2022 S.D. Highway 11 Corridor Study
Nov. 16, 2021 – S.D. Hwy 38 from east of the S.D. Hwy 38P Junction (413th Ave) to 8.3 east of the Alexandria Junction (421st Ave)

November 16, 2021 – S.D. Hwy 38 from east of S.D. Hwy 38P Junction (413th Ave) to 8.3 east of the Alexandria Junction (421st Ave)

Project:
P-PH 0038(48)304, Hanson County, PCN 05FA

Location:
SD38 From E of the SD38P Jct to 8.3 E of the Alexandria Jct

Improvement Type:
Grading, Interim Surfacing, Modify Intersection, Pipework

Public Meeting Information:




 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Nov. 4, 2021 – S.D. 46 in Wagner
Project:
NH 0046(69)288, Charles Mix County, PCN 05JN

Location:
S.D. 46 in Wagner

Improvement Type:
Grading, Surfacing, Storm Sewer, Curb & Gutter, Sidewalk, Lighting, Signals

Project Lane Configuration:
Display

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information 
For more information or comments please use the form below or call Jay Peppel, Mitchell Area Engineer at (605) 995-3340.
Sept. 14, 2021 Proposed Project to Reconstruct I90 Exit 387 (463rd St from Jeffrey St to Diamond Trl)
Proposed Project:
Reconstruct I90 Exit 387 

Location:
(463rd St from Jeffrey St to Diamond Trl)

Public Meeting Information:
September 14, 2021
5:30 PM - 6:30 PM
Hartford Area Fire Hall


Public Meeting Flyer

Location Map

Handout

PowerPoint Presentation

Overall Project Exhibit

Roadway Phasing

Bridge Phasing


Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
June 11 - Jun. 30 2021 Proposed Project to Reconstruct SD Hwy 34 (From the Intersection of SD34 & 469 AVE to the Colman east City Limits)

Project:
NH 0034(193)403, Moody County, PCN 0609

Location:
SD34 - Fm 469th Ave to the E City Limits in Colman

Improvement Type:
Grading, PCC Surfacing, Curb & Gutter, Sidewalk, Storm Sewer, & Lighting

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions. 

Public Meeting Information – June 2021

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
June 3 - Jul. 3, 2021 Union County Master Transportation Plan Study
Dec. 14, 2020 to Jan. 7, 2021 - Online Information for SD 50 from SD 1804 to Lake Andes

Project:
P 0050(129)305, Charles Mix County, PCN 069L 

Location:
SD50 from SD1804 to the West US18 Jct in Lake Andes

Improvement Type:
Grading & Interim Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions. 

Public Meeting Information – December 16, 2020



205
Mark Malone
Road Design Engineering Supervisor
605-773-5409
Nov. 12-Dec. 5 - Online Public Input into the I-229 Exit 3 (Minnesota Avenue) & Exit 4 (Cliff Avenue) Interchanges Study

The South Dakota Department of Transportation (SDDOT), in collaboration with the Sioux Falls Metropolitan Planning Organization (MPO) and the City of Sioux Falls, is holding an online public meeting to present transportation improvement recommendations for the both the I-229 Exit 3 (Minnesota Avenue - Sioux Falls) and Exit 3 (Cliff Avenue – Sioux Falls) interchanges until Dec. 5, 2020, on the website: https://www.i229exits3and4.com/

Due to limitations on public gatherings recommended by the Centers for Disease Control, the SDDOT is posting information to the study website rather than presenting documents at an in-person public meeting. Members of the public may submit questions or comments through the study website or by reaching out to one of the project representatives via email or phone. 

The purpose of this second public meeting is to provide information on: 

  • The recommended alternatives for both interchanges.
  • The Interchange Modification Justification (IMJR) documents for both interchanges.
  • The Environmental Scan Report (ESR) documents for both interchanges.  

Any individuals with disabilities who will require a reasonable accommodation to access the information on the study website may submit a request to the department’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunication Relay Services for the Deaf).  

Public meeting information will be posted to the study website: https://www.i229exits3and4.com/


86,80,81,83,93,184,183,180,88,186,188,94
Steve Gramm
Planning Squad Leader
605-773-3281
93,94
Katrina Burckhard
Planning Engineer
605-773-6641

Aug. 4, 2020 - S.D. 50 from west of Tyndall through Tabor
Project:
NH-PH 0050(116)354 PCN 04K7, Bon Homme County

Location:
SD50 – From W of SD37 Jct, to east of Tyndall and SD37 – From SD50 south 0.5 mi

Improvement Type:
Grading, Milling, AC Resurfacing, AC Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – August 4, 2020, 5:30 p.m.

For more information contact: 


197,206
Scott Rabern
Chief Road Design Engineer
605-773-3433
June 2020 - U.S. 81 from 306th Street to 303rd Street
U.S. 81 from 306th Street to 303rd Street

Project
NH 0081(103)6, Yankton County, PCN 04G5

Location:
US 81 From the End of the Divided Lanes to 303rd St North of Yankton

Improvement Type
Grading, Replace Structure (Bridge), PCC Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – June 2020


Contact


189
Cary Cleland
SF Road Design Project Manager
605-910-7012


May 2020 - S.D. 42 from Willow Run Entrance to just West of S. D. 11

Project:
NH 0042(80)371, Minnehaha County, PCN 06YP 

Location:
S.D. 42 from Willow Run Entrance to just West of S. D. 11 

Improvement Type:
Grading, Storm Sewer, Curb & Gutter, PCC Surfacing, Structure Widening, Signals & Lighting 

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information Published – May 14, 2020

March 3, 2020 - US18 – From I29 to just east of SD 11
Project:

NH 0018(157)438, Lincoln County, PCN 6923

Location:

US18 – From I29 to just east of SD 11

Improvement Type:
Grading and Interim Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – March 3, 2020

For more information or comments please contact the SDDOT project manager Stacy DuChene, Consultant Manager Engineer, at (605) 367-5680 or Chad Hanisch, Project Manager with Infrastructure Design Group, Inc., at (605) 271-5527.
Jan. 7, 2020 - SD Highway 37 from N Main St to National Guard Rd/250th Ave.
Project:
NH 0037(157)76, Davison County, PCN 05UY

Location:
SD Hwy 37 from N Main St to National Guard Rd / 250th Ave in Mitchell

Improvement Type:
Urban Grading, Curb & Gutter, ADA Upgrades, Traffic Signals, Storm Sewer, Roadway Lighting, PCC Surfacing, Replace Structure, Shared Use Path

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – January 7, 2020

For more information or comments please contact the SDDOT project manager Neil Schochenmaier, who can be reached by email at neil.schochenmaier@state.sd.us or by phone at 605.773.3433.
June 6, 2019 - S.D. 52 -Shoulder Widening & Surfacing

Project: P-PH 0052(08)332, PCN 05ET, Yankton County

Location: S.D. 52, From west junction of S.D. 50 S 4.6 miles

Improvement Type: Shoulder Widening and AC Surfacing

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - June 6, 2019

For more information or comments please contact the SDDOT project manager Cary Cleland at 605.367.4970, Ext. 2119.

May 8, 2019 - I-29/41st Street Interchange

Project: IM 0293(106)77 and P 1400(16), PCN 03RA and 05NF, Minnehaha County

Location: I29 Exit 77 (41st Street Interchange) and 41st Street from Marion Road to Shirley Avenue

Improvement Type: I29 Exit 77 (41st Street) Interchange Modification and 41st Street - Grading, Traffic Signals, Curb and Gutter, Sidewalk, PCCP Surfacing, Storm Sewer, ADA Upgrade and Lighting

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - May 8, 2019

For more information or comments please contact the SDDOT project manager Stacy DuChene at 605.367.5680.

April 25, 2019 - S.D. 46 from Beresford to Iowa State Line

Project: P-PH 0046(61)366, Lincoln & Union County, PCN 04JF

Location: SD46 From Beresford to Iowa State Line

Improvement Type: Grading, Interim Surfacing, Replace Structure (RCBC) & Replace Structure (Bridge), Erosion Repair

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - April 25, 2019

For more information or comments please contact the SDDOT project manager Cary Cleland at 605.367.5680.

Mar. 26, 2019 - SD42 - From the Big Sioux River Bridge to the Iowa State Line
Project: NH-P 0042(59)373, Minnehaha County, PCN 03TE

Location: SD42 - From the Big Sioux River Bridge to the Iowa State Line

Improvement Type: Grading, PCC Surfacing, Curb & Gutter, Sidewalk, ADA, Storm Sewer, Lighting

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - March 26, 2019
For more information or to submit comments please contact the SDDOT project manager Cary Cleland, who can be reached by email at cary.cleland@state.sd.us or by phone at 605.367.5680.
Oct. 29, 2018 - S.D. 46 from U.S. 81 to Irene
Project:
P-PH 0046(66)334, Yankton County, PCN 04X4

Location:
S.D. 46 from U.S. 81 to Irene

Improvement Type:
Grading, Structures & Interim Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - October 29, 2018
For more information or comments please contact the SDDOT project manager Cary Cleland at (605) 367-5680.
Oct. 11, 2018 - U.S. 81 from 306th St. to 303rd St. Reconstruction
Project:
NH 0081(103)6, PCN 04G5, Yankton County

Location:
US81 from 306th St. to 303rd St.

Improvement Type:
Grading, Replace Bridge, Pipe Culverts, and AC Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - October 11, 2018
For more information or comments please contact the SDDOT project manager Cary Cleland,at 605.367.5680.
Jun. 18, 2018 - SD 34 from 469th Avenue to east city Limits of Colman
Project:
NH 0034(193)403, PCN 0609, Moody County

Location:
SD34 from 469th Avenue to the east city limits of Colman

Improvement Type:
Removal of existing PCC surfacing, PCC surfacing, curb & gutter, sidewalk & lighting

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - June 18, 2018
For more information or comments please contact the SDDOT project manager Becky Hoffman at 605.773.3938.
Feb. 8, 2018 - US18 - I-29 E to the W Junction of SD11
Project:
NH 0018(157)438 PCN 6923, Lincoln County

Location:
US18 - Fm I-29 E to the W Junction of SD11

Improvement Type:
Grading and Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - February 8, 2018
For more information or comments please contact the SDDOT project manager Mark Malone at (605) 773-7191.
Nov. 16, 2017 - I-29 Overpass at 281st Street
Project:
IM 0292(50)63 PCN 1241 / IM 0292(79)61 PCN 04VV

Location:
I-29 Overpass at 281st Street

Improvement Type:
Remove Structure

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - November 16, 2017
For more information or comments please contact the SDDOT project manager Steve Gramm at 605.773.6641.
Nov. 2, 2017 - U.S. 18/281 in Charles Mix County
Project:
NH 0018(203)333 PCN 04V9

Location:
0.8 miles North of Pickstown over St. Francis Bay & Intersections in Lake Andes

Improvement Type:
Replace Structure, Grading, Intersection Modification & Interim Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - November 2, 2017
For more information or comments please contact the SDDOT project manager Cary Cleland at 605.367.5680.
Aug. 16, 2017 - Hwy 50 Tyndall to Tabor
Project:
NH-PH 0050(116)337, Charles Mix and Bon Homme Counties

Location:
From the east Jct of S.D. 46, south 6 miles toward Avon and from 5 miles west of Tyndall through Tabor

Improvement Type:
Mill & AC Resurfacing; Reconstruct 4 Lane Segments to 3 Lane & AC Resurfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.
Map of proposed construction


Public Information Meeting 2 - August 16, 2017
Public Information Meeting 1 - August 3, 2015
For more information please contact the SDDOT transportation planning engineer Mark Malone at 605.773.7191.
July 25, 2017 - S.D. 50 from the divided lanes West of Vermillion to the divided lanes East of Vermillion
Project:
NH 0050(117)407, PCN 04YU, Clay County

Location:
S.D. 50 from the divided lanes West of Vermillion to the divided lanes East of Vermillion

Improvement Type:
Grading, Widening, Asphalt Concrete Surfacing, Cold Milling Asphalt Concrete, Storm Sewer Removal, Curb & Gutter Removal, Pipe Extend, Lighting and Guardrail

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - July 25, 2017
For more information or comments please contact the SDDOT project manager Cary Cleland at (605) 367-5680.
Jun. 8, 2017 - U.S. 18 from James River to U.S. 81
Project:
PH 0018(192)390, PCN 04KT, Hutchinson County

Location:
U.S. 18 from James River to U.S. 81

Improvement Type:
Shoulder Widening, Grading, Asphalt Concrete Surfacing of Shoulders, Pipe Work & RC Box Culvert Replacements

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - June 8, 2017
For more information or comments please contact the SDDOT project manager Cary Cleland at (605) 367-5680.
May 22, 2017 - S.D. 44 Shoulder Widening
Project:
PH 0044(184)330, PCN 04K0, Douglas / Hutchinson Counties

Location:
S.D. Highway 44 from E. Jct. U.S. 281 to S.D. 37 at Parkston

Improvement Type:
Shoulder Widening, Asphalt Concrete Surfacing of Shoulders, Pipe Work & RC Box Culvert Extensions

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - May 22, 2017
For more information or comments please contact the SDDOT project manager Cary Cleland at 605.367.5680.
May 9, 2017 - S.D. 34 From Sanborn/Miner County Line E to 425th Ave Near Roswell
Project:
P-PH 0034(170)350, PCN 04KR, Miner County

Location:
SD34, Fm Sanborn/Miner County Line E to 425th Ave Near Roswell

Improvement Type:
Shoulder Widening, Culvert Extensions, Structural Replacements

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - May 9, 2017
For more information or comments please contact the SDDOT project manager Neil Schochenmaier at 605.773.3433.
Jan. 17, 2017 - S.D. 50, US18 & US281 Highway in Wagner
Project:
NH-PH 0050(114)324, Charles Mix County, PCN 04HN, SD50 - From E Jct of US18 to SD46
PH 0018(190)348, Charles Mix County, PCN 04JX, US18 - From the E Jct of SD50 to US281
PH 0281(108)35, Charles Mix, Douglas County, PCN 04JE, US281 - From US18 to the Charles Mix/Douglas County Line

Location:
S.D. Highway 50, U.S. 18, U.S. 281 - from Wagner to Douglas County Line

Improvement Type:
Grading, Interim Surfacing, Shoulder Widening and Pipe Work

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - January 17, 2017
For further information regarding this project, contact Cary Cleland, Road Design Engineering Supervisor at 605.367.5680.

open all


Pierre Region

April 23, 2024 - Tripp County Master Transportation Plan
Public Meeting Information

Date and Time:
Tuesday, April 23, 2024, 5:30 p.m. to 7:00 p.m.

Location: 
Tripp County Court House
200 E 3rd St, Winner, SD 57580

View the study website

March 12, 2024 - S.D. Highway 10E & S.D. Highway 10W - Through Pollock

Public Meeting:

Tuesday, March 12, 2024
5:30 p.m. - 6:30 p.m.
Pollock School and Community Center 
916 F Ave. 
Pollock, SD 57648 

Project

PCNs 07C8 & 07C9
P 0010(163)182 & P 1804(53)391

Location:

S.D. Highway 10 and S.D. Highway 1804

Improvement Type:

Sidewalk, ADA Ramps, Curb & Gutter, and Pavement Markings 

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

For further information regarding this project, contact John Villbrandt, SDDOT Mobridge Area Engineer at 605-845-3844.

Jan. 11, 2024 - S.D. Highway 63 North of Eagle Butte

Public Meeting:

Thursday, Jan. 11, 2024
5:30 p.m. - 7 p.m.
Timber Lake Community Center
700 Main St., Timber Lake, SD 57656

Project

06CX Project:  P 0063(55)190

Location:

S.D. Highway 63 - From the west junction of S.D. Highway 20 south 13.1 miles

Improvement Type:

Grading, Interim Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

For more information or comments please contact Jennica Wilcox, who can be reached by email at Jennica.Wilcox@fhueng.com or by phone at 605-777-1973.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
January 4, 2024 S.D. Highway 44 - From East of Wood to the Tripp Co Line

Project:

P 0044(224)215, Mellette County, PCN 077Q

Location:

SD44 – From East of Wood to the Tripp County Line

Improvement Type:

Grading, Interim Surfacing, and Replace Structure - Bridge

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

For more information or comments please contact the SDDOT Chief Road Design Engineer Scott Rabern, who can be reached by email at Scott.Rabern@state.sd.us or by phone at (605) 773-3452.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Statewide Intercity Bus Study - Multi Locations and Dates

Surveys:

User-Rider Survey: https://www.surveymonkey.com/r/sddot_icb_rider

Community Survey: https://www.surveymonkey.com/r/sddot_icb_community

Regional Planning Survey: https://www.surveymonkey.com/r/sddot_icb_regional_planning

Transit Provider Survey: https://www.surveymonkey.com/r/sddot_icb_transit_provider

Meeting Presentation:



For more information about the study, contact Monte Meier, Transportation Specialist, at 605-773-4169, or email monte.meier@state.sd.us.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Oct. 26, 2023 - S.D. Highway 1804 From U.S. Highway 12 S 4.3- Grading, Interim Surfacing

Public Meeting Information:

Oct. 26, 2023 | 5:30 p.m. Mobridge Middle School Theater

114 10th St E, Mobridge, SD 57601

Project: 077X

Location: S.D. Highway 1804 - From U.S. Highway 12 S 4.3

Improvement Type: Grading, Interim Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Mosaic North
Mosaic East

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Nov. 29, 2022 - Walworth County Master Transportation Plan Study
April 19, 2022 Reconstruct U.S. Highway 12 (Through Selby)

Project:

NH 0012(297)209, Walworth County, PCN 077U

Location:

The project is on US12 through Selby

Improvement Type:

Urban Grading, PCC Surfacing, LSDC Overlay, Curb & Gutter, Sidewalk

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout

Contact: 

Brace Prouty brace.prouty@state.sd.us

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
April 14, 2022 Walworth County Master Transportation Plan Study
View the Walworth County Master Transportation Plan Study Website:

https://klj.mysocialpinpoint.com/walworth-county-transportation-plan
Long Range Transportation Plan (LRTP) Comment Period: July 6 - August 6 2021
Click to view: 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
June 9 to July 7, 2021 –US18 - From the East Junction of SD73 to West of Antelope Road/242nd Ave

June 9 to July 7, 2021 –US18 - From the East Junction of SD73 to West of Antelope Road/242nd Ave

Project: NH 0018(199)161, Bennett County, PCN 04WQ 

Location: US18 - From the East Junction of SD73 to West of Antelope Road/242nd Ave

Improvement Type:

Grading, Interim Surfacing

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: June 9 to July 7, 2021

For more information or comments:


205
Mark Malone
Road Design Engineering Supervisor
605-773-5409

June 4 - July 2, 2021 US 212 Forest City Bridge
June 2 - July 2, 2021 Herreid Master Transportation Plan
April 16 to May 14, 2021 – US 18 from SD 391 to West of Martin

Project:
NH-PH 0018(202)121, Bennet & Oglala Lakota County, PCN 04WU

Location:
US18 From SD391 to West of Martin

Improvement Type:
Grading, Interim Surfacing, Replace Structures

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – April 16 to May 14, 2021

CONTACT



205
Mark Malone
Road Design Engineering Supervisor
605-773-5409
July 15- Aug. 7, 2020 - S.D. 73 from S of the White River to Kadoka (online meeting)

Project:
NH 0073(73)62, Jackson County, PCN 05HV 

Location:
SD 73 From South of the White River to Kadoka

Improvement Type:
Grading, Interim Surfacing, Replace Structure (RCBC) & Lighting

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – July 17, 2020

CONTACT



205
Mark Malone
Road Design Engineering Supervisor
605-773-5409


May 9-June 6, 2020 - U.S. 14 (Euclid Avenue), Pierre
Project: NH 0014(185)229, Hughes County, PCN 026Z

Location: US14 (Euclid Avenue) from Sioux Avenue to the Divided Highway W. of SD1804 in Pierre

Improvement Type: Urban Grading, Curb & Gutter, ADA Upgrades, Traffic Signals, Storm Sewer, Roadway Lighting, Surfacing

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Virtual Public Information Meeting - May 9 - June 6, 2020

 

June 20, 2019 - U.S. 12 Reconstruction from Morristown East 9 Miles

Project: NH 0012(206)112 and NH 0012(275)112, PCN 05HW and 05U5, Corson County

Location: U.S. 12- From Morristown, East 9 Miles

Improvement Type: Grading, Interim Surfacing, Replace Structure and AC Surfacing

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - June 20, 2019

For more information or comments please contact the SDDOT project manager Neil Schochenmaier at (605) 773-5107.

January 15, 2019 - U.S. 12 Claymore Creek Bridge Replacement & S.D. 1806 Realignment & Grand River Casino Entrance Relocation

Project: NH 0012(197)183, PCN 04XF & P 1806(18)363, PCN 05M9, Corson County

Location: US12/SD1806 west of Mobridge near the Grand River Casino

Improvement Type: Bridge Replacement, intersection realignment and entrance relocation

Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - January 15, 2019

For more information or to submit comments please contact the SDDOT project manager Karen Olson at 605.773.5409.

October 22, 2018 - S.D. 47 - Walworth Co.
Project:
P 0047(111)203, Walworth County, PCN 00XM

Location:
South Dakota Highway 47 from S.D. 20 to U.S. 12

Improvement Type:
Grading, Interim Surfacing, Replace Bridges, Box Culverts, and Pipe Culverts

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information - October 22, 2018
For further information regarding this project, contact Sam Gilkerson at 605.773.6588.
August 29, 2017 - U.S. 14 Sioux Ave to SD1804 in Pierre
Project:
NH 0014(185)229, PCN 026Z, Hughes Co.

Location:
U.S. 14 - From Sioux Ave to the Divided Hwy W of SD1804 in Pierre

Improvement Type:
Urban Grading, Curb & Gutter, ADA Upgrades, Traffic Signals, Storm Sewer, Roadway Lighting, Surfacing

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting - August 29, 2017
Public Meeting - June 1, 2017
For more information please contact the SDDOT transportation planning engineer Mark Malone at 605.773.7191.
April 27, 2017 - Highway 12 - Structure replacements
Project:
NH-PS 0012(187)107, Corson County, PCN 04FL

Location:
U.S. 12 - Strs 7.9 mi E of the Perkins Co Line & 0.2 mi W of S.D. 65S over the Burlington Northern RR

Improvement Type:
Replace Structure (Bridge) and Approach Grading

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Information Meeting - April 27, 2017
For more information or comments please contact Neil Schochenmaier at 605.773.3433.
November 12, 2013 - Missouri River Bridge (US 14/83 SD 34) Pierre

open all


Rapid City Region

April 24 - 25, 2024 - Lawrence County Master Transportation Plan
The Lawrence County Master Transportation Plan is a long-range plan that evaluates the transportation system under Lawrence County's jurisdiction. The plan analizes the current issues and needs of the transportation system while also taking into consideration anticipated economic growth and development that will affect future traffic conditions as the area continues to grow. These elements are analyzed to form a set of short-term and long-term solutions to address the transportation challenges within the county.

Public Meetings:
Join us at any of the following meetings as we gather input on needs and issues from community members. 


 
Stakeholder Meeting #1

April 24, 2024
10:00 - 11:30 am

Lodge at Deadwood
100 Pine Crest
Deadwood, SD

 ---

Public Meeting #1
April 24, 2024
5:30 - 7:00 pm

Lodge at Deadwood
100 Pine Crest
Deadwood, SD

 ---

Stakeholder Meeting #2
April 25, 2024
2:30 - 4:00 pm

Nemo Community Center
12746 Nemo Road
Nemo, SD

 ---

Public Meeting #2
April 25, 2024
5:30 - 7:00 pm

Nemo Community Center
12746 Nemo Road
Nemo, SD

View the Study Website

April 4, 2024 – U.S. Highway 16 (Enchantment Road to the Tower Road Overpass)

Meeting Details:

Thursday, April 4, 2024
5:30 p.m. – 7 p.m. Mountain Time
   
Zion Lutheran Church
4550 Mount Rushmore Rd.
Rapid City, SD 57701

Project Information:

NH 0016(94)65
Pennington County, PCN 078D
Structure # 52-410-318

Improvement Type:

Consolidating access, storm sewer, curb and gutter, raised median, sidewalks and shared use path, intersection and roadway lighting 

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 

Notice
Flyer
Location Map
Presentation
Handout
Display 1 
Display 2 

For more information or comments please contact Stacia Slowey, HDR Engineering, who can be reached by email at stacia.slowey@hdrinc.com.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 20, and 21, 2024 - Interstate 90 Local Roads Crossing Study

The South Dakota Department of Transportation (SDDOT), in collaboration with Pennington County and the Federal Highway Administration, will hold two public meeting open houses to inform area residents about the Interstate 90 Local Roads Crossing Study. The first public meeting is planned for Wednesday, March 20, 2024, from 5:30 p.m. to 7 p.m. at the New Underwood Community Center located at 500 S. A Ave. in New Underwood. The second public meeting open house is scheduled for Thursday, March 21, 2024, from 5:30 p.m. to 7 p.m. at the Wall Community Center located at 501 Main St. in Wall.

https://www.i90localroadcrossingstudy.com
Jan. 24, 2024 - Interstate 90, exit 48 (Stagestop Rd.) Interchange Modification Study

Public Meeting Open House

What: A presentation will take place shortly after 5:30 p.m. Afterwards, South Dakota Department of Transportation (SDDOT), in conjunction with the Rapid City Area Metropolitan Planning Organization (MPO), City of Summerset, and Meade County staff will be available with displays to discuss the proposed project and answer any questions.

Date: Wednesday, Jan. 24, 2024

Time: 5:30 p.m.-7 p.m.

Location: Stagebarn Middle School
12500 Sturgis Rd.
Summerset, SD 57769


View more information on the study

Dec. 18, 2023 - U.S. Highway 85 From Wyoming to Cheyenne Crossing

Meeting Date: Monday, Dec. 18
Meeting Time: 5:30 p.m.-7 p.m. MT
Meeting Place: Spearfish Canyon Lodge 10619 Roughlock Falls Rd. Lead, SD 57754

Project Location: U.S. Highway 85 from the Wyoming State Line to U.S. Highway 14A

Improvement Type: Design, Wetland Delineation, Right-of-Way

Project: NH 0085(106)0; Lawr06J, Lawrence County, PCN 06J8

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 
Notice
Flyer
Location Map
Presentation 
Handout
Display

For more information or comments please contact Jennica Wilcox, who can be reached by email: Jennica.Wilcox@fhueng.com. Comments will be accepted through Feb. 15, 2024. 

Dec. 14, 2023 - U.S. Highway 16 Corridor Study: Sub-Area Analysis (East of Rockerville to west of Neck Yoke Road)
U.S. Highway 16 Corridor Study: Sub-Area Analysis (East of Rockerville to west of Neck Yoke Road)

Date:
Thursday, December 14, 2023

Time: 5:30-7 p.m. MT

Place: Black Hills Energy Event Center (located in lobby)
7001 Mount Rushmore Road
Rapid City, SD 57701

Nov. 2, 2023 - US16 Corridor Study Sub-Area Analysis (East of Rockerville to west of Neck Yoke Road)
Date: Thursday, Nov. 2, 2023

Time: 5:30 p.m.-7:00 p.m. Mountain Time

Place: Black Hills Energy Event Center (located in lobby)
7001 Mount Rushmore Road Rapid City, SD 57701

Public Meeting Information: https://www.us16corridor.com/
Oct. 4, 2023 - U.S. Highway 14A / U.S. Highway 85 / Deadwood Box Corridor Study
When:

Tuesday, Oct. 4, 2023
4:30 - 6:30 p.m.

--- 

Where: 

Homestake Adams
Research and
Cultural Center
150 Sherman St.
Deadwood, SD 57732

View the Study Website
Aug. 22, 2023 - U.S. Highway 85 - 0.4 Miles South of U.S. Highway 212 Over the Belle Fourche River

Location: U.S. Highway 85 - 0.4 Miles South of U.S. Highway 212 Over the Belle Fourche River

Improvement Type: Structure (Bridge) Replacement, Surfacing, Curb & Gutter, Sidewalk, and Lighting

Project: NH 0085(104)56, Butte County, PCN 04G4

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information: 
Notice
Flyer
Location Map
Presentation 
Handout
Display

For more information or comments please contact the SDDOT project manager Mark Malone, who can be reached by email at Mark.Malone@state.sd.us or by phone at (605) 773-5409.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
July 25, 2023 - Hill City Master Transportation Plan Study

Welcome to the Hill City Master Transportation Plan web page!  The City of Hill City, along with the South Dakota Department of Transportation (SDDOT), is sponsoring the development of this planning study.   The study will examine current transportation issues and needs facing Hill City and decide how best to address them. All transportation modes will be studied, including roadways, transit, and pedestrian and bicycle facilities.  When completed, the study will outline recommended improvements and provide a plan for implementing them. The goal is to create a safe and efficient transportation plan that will serve the City of Hill City moving forward.

About the Study

The study will consist of three main phases to be completed over the summer of 2023:

  • The first phase will inventory and analyze existing and future conditions and identify the problems and needs.
  • The second phase will develop strategies, alternatives, and potential solutions that address the problems and fulfill the needs. Because of limited budgets for transportation infrastructure maintenance and construction, costs will be considered when developing alternatives. Addressing major problems identified as most important to the community and the transportation system will increase the impact of this study.
  • The third and final phase will select alternatives for further study and prioritize them based on planned investments for the City of Hill City.

--- 

Study Area

The study area includes the City of Hill City and some areas adjacent to the city limits relevant to the transportation system.

Map of Study Area 

 ---

Public Involvement

An important component of this master transportation planning study is your input.  We want to know about your travel patterns, your destinations and the challenges you face getting there. Hearing from the community at large is integral to the success of the planning recommendations. Hill City is your home, and nobody knows it as well as you. As the study progresses, we will need your input on the potential alternatives we develop for improving our area’s transportation network.

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2021 passage of Infrastructure Investment and Jobs Act (IIJA) requires a public involvement process. In accordance with the Department's public involvement plan document, the Hill City Master Transportation Plan Study strives to keep the public involved with the study as much as possible. 

 ---

Online Survey - Closed

 ---

Public Meetings

Public meetings for the study will be scheduled to collect public input, provide information and answer questions. These meetings are a great opportunity to hear from the community of Hill City and gain insight that will be valuable to SDDOT’s study.

Second Public Meeting- Tuesday, July 25, 2023 – 5:30 – 7:00 p.m. Hill City Center


First Public Meeting- Thursday, June 29, 2023 – 5:30 – 7 p.m. Hill City Center


 ---

Stakeholder Group Meetings

Civic entities and certain business types often have aspects that can have unique impacts to a city’s transportation system that can be more thoroughly discussed outside of the public meeting format.  As such, stakeholder groups consisting of representatives from the businesses, civic elements, and various demographics of the population within Hill City will be invited to a set of stakeholder meetings that will be held throughout the study period.

 ---

Study Documents

---

Methods and Assumptions


---

For more information or comments please contact any of the following representatives at the SDDOT:

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
July 19, 2023 - U.S. Highway 85 Corridor Study from Spearfish to Deadwood
May 23, 2023 Junction Avenue Corridor Study in Sturgis
May 4, 2023 S.D. Highway 79 from Slim Buttes north to S.D. Highway 20

May 4, 2023 S.D. Highway 79 from Slim Buttes north to S.D. Highway 20

Location: SD79 – From South of Slim Buttes to SD20

Improvement Type: Grading and Interim Surfacing

Project: P 0079(83)184, Harding County, PCN 06R8

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display - South
Display - Center 
Display - North

For more information or comments please contact the SDDOT project manager Mark Malone, who can be reached by using the below contact form or by phone at (605) 773-5409.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
April 27, 2023 I-90/U.S. Highway 85 Spearfish Rest Area/Welcome Center Corridor Study

The South Dakota Department of Transportation (SDDOT), in collaboration with the South Dakota Department of Tourism and Stantec Consulting, will hold an open house public meeting at Spearfish City Hall, located at 625 N. 5th St. in Spearfish, on Wednesday, April 27, 2023, from 5:30 to 7 p.m. A short presentation will be provided at 5:45 p.m.

The Department of Tourism and SDDOT have been working together to revitalize South Dakota’s existing Interstate rest areas and welcome centers for the traveling public.

The existing Spearfish rest area located along Interstate 90 (eastbound) near the Wyoming and South Dakota border has been identified by the State as needing to be reconstructed. This provides an opportunity to review the existing location, as well as the nearby corridor, for a location that best serves the needs of South Dakota visitors and residents. Along with the existing rest area location near the SD/WY border, locations north of Exit 10 off of US85 as well as northwest of Exit 17 have been identified for further consideration.

The purpose of this open house public meeting is to provide project information, answer questions, and collect public feedback on proposed locations. Area residents, business owners, and daily commuters are encouraged to participate in this public meeting. The opportunity to present written comments will be provided. Comments on the public meeting will be accepted until Wednesday, April 19, 2023.

Notice is further given to individuals with disabilities that this open house is being held in a physically accessible place. Any individuals with disabilities who will require a reasonable accommodation to participate in the open house should submit a request to the department’s ADA Coordinator at 605-773-3540 or 1-800-877-1113 (Telecommunication Relay Services for the Deaf). Please request the accommodations no later than two business days prior to the meeting to ensure accommodations are available. For those who cannot attend the open house or desire additional information on the overall study, presentation materials are also available on the study website at www.SpearfishRestAreaStudy.com.

The website also allows for online comments.

For more information, contact Tammy Williams at 605-295-7212 or by email at Tammy.Williams@state.sd.us.

April 13, 2023 - I-90 Exit 63 (Box Elder / Ellsworth AFB Commercial Gate) Interchange Modification Study, Environmental Review & Design
An informal public meeting will be held on Thursday, April 13, 2023, 6:00 pm – 7:30 pm for the I-90 Exit 63 Interchange Project at the Box Elder City Hall, 420 Villa Dr., Box Elder, SD.

A presentation will take place shortly after 6:00 p.m.

Afterward, SDDOT staff will be available with displays to discuss the proposed project and answer any questions.

View the project website for more details
Feb. 16, 2023 U.S. Highway 85 - From 7 miles N of Buffalo to Ludlow

Feb. 16, 2023 – U.S. Highway 85 - From 7 miles N of Buffalo to Ludlow

Location: U.S. Highway 85 - From 7 miles N of Buffalo to Ludlow

Improvement Type: Grading, Interim Surfacing, Bridge Replacement

Project Number: 07C7

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Mosaic South
Mosaic Center
Mosaic North  

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Feb. 2, 2023 Spearfish Colorado Boulevard Corridor Study

The purpose of this open house public meeting is to discuss and gather input to help shape the long-range vision of the Colorado Boulevard corridor. The public meeting will be informal, consisting of a presentation and one-on-one discussion with the study team. The presentation will take place at 5:45 p.m. Afterward, members of the study team will be available with displays to discuss the study, gather input on issues and needs along this corridor, and answer questions. During this time, the public will also have the opportunity to submit written comments. Comments will be accepted until Thursday, March 2, 2023.

www.ColoradoBlvdCorridorStudy.com

 

November 22, 2022 – Intersection of U.S. Highway 16 & Neck Yoke Road

November 22, 2022 – Intersection of U.S. Highway 16 & Neck Yoke Road

Location: Intersection of U.S. Highway 16 & Neck Yoke Road

Improvement Type: Grading, Asphalt Surfacing, Replace Bridge

Project Number: 06X3

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Mosaic

For more information or comments please contact the SDDOT project manager Mark Malone, who can be reached below or by phone at (605) 773-5409.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
October 25, 2022 - S.D. Highway 44 Bridge

Location: on S.D. Highway 44 near Cliffside Park, located four miles west of the S.D. Highway 231 junction

Improvement Type: Bridge Replacement

Project Number: 05Q8

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout

July 12, 2022 - U.S. Hwy 385 (4 N. of SD44 Jct to N. of Nemo Road)

Location: US Hwy 385 (4 N. of SD44 Jct to N. of Nemo Road)

Improvement Type: Shoulder widening, intersection improvements, spot grading, and structure work.

Project Number: 03X7

Public Meetings: The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 28, 2022 - US14A - Str. 0.2 E of Cheyenne Crossing Over Ice Box Ck

Project:

NH-B 014A(26)29, Lawrence County, PCN 06XL

Location: U.S. Highway 14A - 0.2 Miles East of Cheyenne Crossing

Improvement Type:

Replace Reinforced Concrete Box Culvert, Approach Grading

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

Notice
Flyer
Location Map
Presentation
Handout
Display

For more information or comments please contact the SDDOT project manager Mark Malone, who can be reached by email at Mark.Malone@state.sd.us or by phone at (605) 773-5409.

 

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
March 3, 2022 – In Keystone, US16A Structure over Battle Creek & SD40 Sidewalk from US16A to 3rd Street

Project:

P 016A(11)56 & P 0040(330)32, Pennington County, PCN 05V8 & 0637

Location:

US16A Structure Replacement over Battle Creek & SD40 Sidewalk in Keystone

Improvement Type:

Structure Replacement, Surfacing, Curb & Gutter, Sidewalk, Lighting, and Signals

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information:

 For more information or comments please contact the SDDOT project manager Neil Schochenmaier, who can be reached by email at Neil.Schochenmaier@state.sd.us or by phone at (605) 773-5107.

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
Interstate 90 (Exit 32-40) Corridor Study in Meade County
I-90 Exit 46 - Elk Creek Road

Project:
IM0901(187)45, Meade County, PCN 034J 

 Location:
 I-90 EXIT 46 (Elk Creek Rd)

Improvement Type:
Interchange Reconstruction

Public Meetings:

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – Virtual / Online only March 5 - April 9, 2021

Contact

Jennica M. Wilcox, PE
Project Managaer
office: 605.777.1973 cell: 719.351.4885
600 E 7th Street, Sioux Falls, SD 57103 
jennica.wilcox@fhueng.com 
http://www.fhueng.com/  

Contact

Comments will be accepted for 14 calendar days after the public meeting date.
Disclaimer: Email addresses and phone numbers will never be sold or used in any manner not related to the project for which this information is being provided.
US18/SD407 Reconstruction through Pine Ridge

Project:
NH 0018(195)103 and N 0407(00)01, PCN 04FC and 06N4, Oglala Lakota County

Location:
U.S. 18 in Pine Ridge Fm 2 Blocks North of S.D. 407 to East of Indian Health Road and   S.D. 407 in Pine Ridge Fm Cherry Hill Court to U.S. 18 

Improvement Type:
Urban Grading, Curb and Gutter, ADA Upgrades, Lighting, Traffic Signals 

Construction Year:
2023

Public Meetings:
The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. Public meetings for the project scope and/or design will occasionally be scheduled to collect public input, provide information and answer questions.

Public Meeting Information – In-person meeting will not be held 


For more information or comments please contact:

204
Thomas Druyvestein
Operations Maintenance Engineer

open all


Individuals needing assistance, pursuant to the Americans with Disabilities Act (ADA), should contact the SDDOT ADA Coordinator (605-773-3540) two business days prior to the meeting in order to ensure accommodations are available. For any in-person meeting, notice is further given to individuals with disabilities that the meeting is being held in a physically accessible location.

TransportationDoing Business
Certification & AccreditationContractorsEngineering/Design ServicesEnvironmentalLocal GovernmentsTraffic Incident Management
Projects & Studies
PlanningStudiesConstruction ProjectsSDDOT InnovationPublic Meetings
Programs & ServicesTravelersInside SDDOTDOT Fact BookBlogsHome test