Special Studies
Statewide Studies
Expressway Feasibility Studies
Eastern Dakota and Pierre to I-90 Expressway Executive Summary
Eastern Dakota and Pierre to I-90 Expressway Feasibility Complete Study
Interchange Justification Studies
I-29 Exit 75 / I-229 Exit 1A and 1B (System Interchange; Sioux Falls)
I-90 Exit 396/I-29 Exit 84 (System Interchange; Sioux Falls)
I-90 Exit 400/I-229 Exit 10 (System Interchange; Sioux Falls)
Corridor Studies
Decennial Studies:
2010 Decennial Interstate Corridor Study Phase 1 Final Report (16MB)
2010 Decennial Interstate Corridor Study Phase 2 Final Report (12MB
2010 Decennial Interstate Corridor Study Phase 3 Final Report (10MB)
2020 Decennial Interstate Corridor Study Phase 3 Report
Local Studies:
Interstate Studies:
I-229 Major Investment Corridor Study
I-190 Corridor / Silver Street Interchange Study in Rapid City
Highway Studies:
U.S. 14/U.S. 83/S.D. 34 Missouri River Bridge Replacement Study
U.S. Highway 14A (Colorado Boulevard) Corridor Study Including I-90 Exit 14 in Spearfish
U.S.16 (Mount Rushmore Road/8th Street) Corridor Study through Rapid City
Area Studies
Kingsbury County Master Transportation Plan (Coming Soon)
Sioux Falls Railroad Corridor Analysis and Crossing Safety (Coming Soon)
No Current Studies
Studies without a link are available upon request from the planning squad leader below.
Contacts
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
