S.D. Highway 15 - From Clear Lake South to S.D. Highway 28


Project Summary:

This project consists of grading and widening to improve road smoothness and sight distance to increase safety.

There will be an interim surface of gravel and asphalt throughout the winter of 2024-2025 with a paving project to follow in 2025.

Project Updates:

May 20, 2025: 

April 15, 2025 – May 15, 2025, Completed Work: The contractor has completed temporary surfacing work on the remaining grade. They have also begun minor miscellaneous work which remains on the project including punch list items, rock picking, and ditch drainage issues. 

Anticipated work in May 15, 2025 – June 15, 2025: The contractor should complete minor miscellaneous items including punch list items. Surfacing work is tentatively scheduled to begin in July. 