Closure Scheduled on S.D. Highway 10 for Bridge Replacement Project Near Houghton
For Immediate Release:
Wednesday, March 12, 2025
Contact:
Robert Ward, Aberdeen Area Engineering Supervisor, 605-626-7885
ABERDEEN, S.D. – Beginning Monday, March 17, 2025, a bridge replacement project is scheduled to begin over the James River (Sand Lake) on S.D Highway 10 west of Houghton. Highway 10 will be closed to through traffic during the bridge replacement project. Motorists should plan to use an alternative route. A signed detour route will be provided using U.S. Highway 281 and S.D. Highway 37.
The prime contractor for this $4.8 million project is RR Schroeder Construction, Inc. of Glenwood, MN. The overall project completion date is November 2025.
Find additional information about this project on the South Dakota Department of Transportation website at https://dot.sd.gov/sandlake.
About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic