S.D. Highway 34 near Howes and S.D. Highway 73 South of Faith
Project Summary:
The road surface will be replaced to provide a smoother ride. Crews will repair areas affected by fault heaves. Shoulders will be widened and paved to improve safety. Pipes will be rehabilitated to prevent future failures and improve drainage.
Project Updates:
June 25, 2026:
Anticipated Work in July 2026: Mainline asphalt paving will be completed throughout the project area. A flush seal will be applied to protect the new asphalt surface. Shoulders will be bladed to eliminate drop-offs, and final pavement markings will be installed. The project is anticipated to be substantially complete, with all traffic-impacting operations finished.
June 2026, Completed Work: Prime coat was applied to the shoulders. Blade-laid asphalt pavement was placed to fill the milled surface. Fault heave repairs were completed at two locations on S.D. Highway 34. The repairs included removing the existing pavement surface and base course, undercutting the affected areas, installing underdrains, replacing and compacting embankment material, installing new base course, and paving two lifts of asphalt. Mainline paving began and was completed on most of the S.D. Highway 34 segment.
Project Photos:
Schedule:
May 6, 2026 - Oct. 30, 2026
Location:
S.D. Highway 34 from Ziebach County line, 19 miles west.
S.D. Highway 73 from Faith, 14 miles south.
Benefits:
Resurfacing
Repair fault heaves
Widen road shoulders
Pipe Rehabilitation
Estimated Cost:
$11.8 Million
Contractor:
Anderson Western, Inc
PCN: 079F & 06PH
STATEWIDE CONSTRUCTION PROJECTS PAGE
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic