S.D. Highway 25 from U.S. Highway 212 North 9 Miles

S.D. Highway 25 from U.S. Highway 212 North 9 Miles construction location map.

Project Summary:

The project will replace and upgrade drainage structures to help improve water flow in the area. Crews will also regrade the roadway, reducing hills and filling low spots to provide better visibility for travelers. In addition, the project will widen the shoulders along this segment to enhance safety.

Resurfacing project to follow in 2027. 

Detour Maps:

S.D. Highway 25 from U.S. Highway 212 North 9 Miles Detour Map

Project Updates:

June 29, 2026:

Anticipated Work in July 2026:

Grading operations will continue from 170th Street north to 168th Street until road shaping and embankment work can be stabilized with erosion control measures and final fine grading is completed.

Once stabilization is complete, work will begin north of 168th Street. Asphalt milling and reclamation operations will continue to approximately 166th Street.

Pipe installation will continue ahead of the grading operations, and overburden material will be hauled north to adjust the roadway's vertical alignment.

Completed Work in June 2026:

Initial grading and road shaping were completed on the first 3 miles of S.D. Highway 25 north of U.S. Highway 212.

Grading, embankment construction and pipe installation progressed north to approximately 168th Street, east of Garden City.

Overburden material was hauled south to the area near 169th Street and the causeway through 170th Street.

Project Photos:

 

Schedule:

  • Spring 2026 - Fall 2027

Location:

  • S.D. Highway 25 from U.S. Highway 212 North 9 Miles

Benefits:

  • Improve Drainage

  • Grading

  • Improve Sight Distance

  • Added Shoulders

  • Interim Surfacing in 2026

  • Resurfacing in 2027

Estimated Cost:

  • Coming Soon

Contractor:

  • Coming Soon

PCN: 069D & 06DX

STATEWIDE CONSTRUCTION PROJECTS PAGE