Canton - U.S. Highway 18 to Interstate 29



Project Summary:

Located east of Interstate 29 at exit 62, U.S. Highway 18 connects the city of Canton to Interstate 29 with a two-lane undivided rural highway. This stretch of Highway 18 has shown increased traffic volumes in which the current two-lane highway is reaching capacity. This eight-mile segment will be reconstructed with a four-lane divided highway to accommodate the increased traffic volumes. Additionally, this project includes the replacement of existing box culverts which are sized appropriately based on watershed information. 

The project includes grading, curb and gutter, storm sewer, box culvert replacement, lighting, permanent signing, pavement marking, and surfacing.

 

Sign Up for Text Notifications:

For updates on MAJOR traffic changes, subscribe to a free text-in service. To subscribe, simply text the keyword listed below to 605-566-4041. Subscribers can unsubscribe at any time. 

Text CANTON18 to 605-566-4041


Project Timeline:

Summer 2023 - Summer 2025


Project Updates: 


Sept. 17, 2025: 

Aug. 15 – Sept. 15, 2025, Completed Work:
Colored concrete along the median was completed. Pavement markings and permanent sign installation continued.

Anticipated Work Sept. 15 – Oct. 15, 2025:
Crews will continue installing permanent markings and signs. Final punch-list items will be addressed, and project cleanup will continue.

Project Photos:


Project Contract Amount:

$45.6 Million

Project Contacts:

Contractor:
Reede Construction Inc.
Brett Aadson 605-971-0922

SDDOT:
Ryan Story  605-940-0721
Spencer Thompson  605-201-0535


STATEWIDE CONSTRUCTION PROJECTS PAGE



PCN 6923