Sturgis Rally Travel Information FAQ
FAQ's:
- Where can I find information relating to temporary road closures? https://www.sd511.org/
- Where can I find road construction information? https://www.sd511.org/
- Where can I find information on U.S. Highway 385 road construction? https://us-385.com
Construction activities will be paused beginning Wednesday, July 30, 2025, for the Sturgis Rally.
Find additional Highway 385 project information including maps, timelines, and construction updates on the website at https://www.US-385.com. For updates on major traffic changes on the Highway 385 project, subscribe to a free text-in service. To subscribe, simply text “US385” to 605-566-4041. Subscribers can unsubscribe at any time.
- What amenities are offered at interstate rest stops? View Here
- What roadways have reduced speed limits or temporary traffic signals? View Below
Speed limits are reduced on the following highways:
*Speed limits will be reduced on the following highways from Thursday, July 31, 2025, through Sunday, Aug. 10, 2025.
- The Interstate 90 speed limit will be reduced from 75 mph to 65 mph from west of exit 55 (Deadwood Avenue) in Rapid City to west of exit 30 (Lazelle Street) in Sturgis.
- The S.D. Highway 34 speed limit will be reduced from 65 mph and 45 mph to 35 mph from Blanche Street in Sturgis, east approximately four miles (east of Buffalo Chip).
- The S.D. Highway 79 speed limit will be reduced from 65 mph to 45 mph from the junction of S.D. Highway 34 north approximately two miles (north of Iron Horse Campground) and from 0.05 miles south of the intersection with Bighorn Road north approximately one mile, near the Full Throttle Saloon and Drag Pipe Saloon approaches.
Temporary traffic signals will be installed at the following locations:
- S.D. Highway 34/79 and Nellie Avenue;
- S.D. Highway 34/79 and Ft. Meade main entrance;
- S.D. Highway 34/79 and Glencoe Drive;
- S.D. Highway 34 and S.D. Highway 79 east of Sturgis;
- S.D. Highway 34 and Ft. Meade Way (Buffalo Chip);
- S.D. Highway 44 and U.S. Highway 385;
- U.S. Highway 16 and U.S. Highway 385 east of Hill City;
- S.D. Highway 34/79 and 8th Street in Sturgis;
- S.D. Highway 34/79 and 11th Street in Sturgis;
- Interstate 90 exit 32 westbound ramp;
- Interstate 90 exit 32 eastbound ramp; and
- Interstate 90 exit 55 eastbound ramp
The traffic signals will be in full operation from Friday, July 25, 2025, through the end-of-day on Monday, Aug. 11, 2025.
Rally Traffic Counts:
Friday, Aug. 1, 2025: 56,000 vehicles entered
• Up 8.2% from the previous five-year average
Saturday, Aug. 2, 2025: 62,500 vehicles entered
• Up 12.5% from the previous five-year average
Sunday, Aug. 3, 2025: 60,495 vehicles entered
• Up 2.4% from the previous five-year average
2025 Total to Date (3-days): 178,995 Vehicles (Up 7.6%)
Previous Five-Year Average (2020-2024) 3-day total to date: 166,393 Vehicles
VIEW THE LAST 10 YEARS OF TRAFFIC COUNT DATA
Featured Stories:
KOTA TV FEATURED STORY ON U.S. HIGHWAY 385 RECONSTRUCTION DURING STURGIS MOTORCYCLE RALLY
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic