Pavement Repair Project Scheduled to Begin on S.D. Highway 115 from Sioux Falls to Dell Rapids
For Immediate Release:
Tuesday, Sept. 9, 2025
Contact:
Steve Neumeister, Project Engineer, 605-367-5680
SIOUX FALLS, S.D. – On Friday, Sept. 12, 2025, a pavement repair project is scheduled to begin on S.D. Highway 115 from East Dike Place in Sioux Falls to 248th Street just south of Dell Rapids. Pavement repair work will be performed on both northbound and southbound driving lanes. This project will also include pavement repair on Interstate 229 at the exit 9 Benson Road interchange and I-229 southbound lanes from Louise Avenue to Interstate 29. The project includes pavement repair, sealing cracks, and resealing joints.
During the repair project, Highway 115 will be reduced to a single lane of traffic controlled by a portable traffic control signal system. Southbound I-229 will be reduced from two lanes to a single lane of traffic. Traffic control measures will continue to guide motorists around the closures. Drivers are urged to use caution and reduce their speed while traveling through the area.
The prime contractor for this $1.5 million project on I-229 and Highway 115 is Interstate Improvement, Inc. of Faribault, MN. The overall project completion date is Friday, Nov. 7, 2025.
About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic