Winner - U.S. Highway 18 and S.D. Highway 44

 

Project Summary:

This two-year project will complete the reconstruction of the roadway through Winner. This project will upgrade the sidewalk, ADA panels, lighting through town, underground utilities and the roadway on Highways 18 and 44 through Winner.

Project Timeline: 

Project Start Date: April 18, 2022
Project End Date: Week of August 21, 2022

 

Project Press Releases: 

April 22, 2022

 

Project Updates: 

Visit this project's Facebook Page by Reede Construction: Winner Highway Construction 2022-2023 | Facebook

Completed Work:  The Contractor has completed all approach pipe on the south and north sides of the SD Highway 44 work. They have laid fabric and completed subgrade work from Jackson St. to the east end of the project. The Contractor also removed the surfacing on the eastbound lane and turning lane from Subway to Jackson St. They also have built a subgrade for roughly 2,000 feet of the new walk path.

Anticipated Work in September: The Contractor will continue to process the select subgrade and lay fabric, base material, and geogrid from Subway to Jackson St. They will pour the sidewalk and remove the surfacing on the westbound lane from Subway to Jackson St.

9/20/2022: Work is underway on SD Highway 44 in Winner to place new concrete pavement in the west bound lane and center turn lane from Sale Barn Road to the junction of SD 44 and US 18.  Expectations are to have these two lanes fully placed by the end of this week.  Soon thereafter, once the concrete has cured enough to have strength and final work completed on the new driving surface, work will begin to allow for two way traffic to be placed onto these new lanes and utilize this new pavement so we can focus on placing concrete in the new eastbound lane of SD Highway 44 throughout this same segment length.

 

Project Photos:

September 2022:

August 2022:
  

July 2022: 
(L to R: Twin 42” RCP Arch cross pipe, Temporary ADA Walkway, Reinforcement Fabric on EBL)

  


June 2022:
(L to R: Approach pipe along Highway 44, Updated drainage along the south side of Highway 44,  Completed approach pipe along Highway 44)

  

May 2022: Northern Plains installing City of Winner Sanitary Sewer

 


Project Contract Amount:

$21 Million

 

Project Contacts:

Contractor: Reede Construction, Inc. Jesse Bruns Mike Flakus (605) 225-7082

SDDOT: Jordan Nelson (605) 842-0810


2022 CONSTRUCTION PROJECTS PAGE



PCN 03TK & PCN 04F9

TransportationDoing Business
Certification & AccreditationContractorsEngineering/Design ServicesEnvironmentalLocal Governments
Projects & Studies
PlanningStudiesConstruction ProjectsSDDOT InnovationPublic Meetings
Programs & ServicesTravelersInside SDDOTDOT Fact BookBlogsHome test