S.D. Highway 38 Bridge Repair Continues at Interstate 90 near Hartford
For Immediate Release: Thursday, Jan. 26, 2023
Contact: Steve Neumeister, Project Engineer, 605-367-5680
HARTFORD, S.D. – Repair work continues on the Interstate 90 eastbound bridge structure over S.D. Highway 38 (exit 390 at Hartford). Highway 38 was closed (northbound and southbound) earlier in January.
The $1.2 million project will repair the bridge damaged by an oversized vehicle hit in September 2022. The construction project includes partial deck and rail replacement, girder replacement, girder repair, and crossover removal.
The contractor plans to open one lane on Highway 38 to traffic beginning Friday, Feb. 10, 2023. Once the single lane is opened on Highway 38, traffic will be controlled with traffic signals. The contractor will continue to work in the closed lane.
Traffic Alerts:
Interstate 90 eastbound lanes will continue to be reduced to a single lane through this area.
Both lanes on westbound Interstate 90 are open to traffic through this area.
Timeline:
Weather dependent, replacement of the deck is scheduled to be completed and fully open to traffic by Friday, March 3, 2023.
Additional items to be completed on the project by June 2023 include the epoxy deck seal and removal of the crossover.
The prime contractor for this project is Journey Group Companies of Sioux Falls, SD.
About SDDOT:
The mission of the South Dakota Department of Transportation is to efficiently provide a safe and effective public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-