Project Summary:
Project work consists of various locations of concrete repair, concrete surface grinding of the entire roadway between Winner and Colome, paving of asphalt shoulders along the entire length and bridge approach slab repair. This will create a smoother driving surface and increased safety for the public.
Project Timeline:
April 10, 2023 - November 2023
Project Photos:
Project Videos:
Project Contract Amount:
4.8 Million
Project Contacts:
Contractor:
Bituminous Paving Inc.
Bill Bajari 320-273-2113
The SDDOT Project Engineer:
Hailey Boese 605-842-0810